Quality Control: What We Check Before Your Order Ships

High quality is a claim; an inspection record is evidence. This page lists the stages an order passes through, what is checked at each one, and what you receive as proof. It is written so you can hold us to it.

The seven checkpoints

Stage What is checked Evidence you receive
1. Incoming material Fabric weight, profile thickness, acrylic clarity, LED batch Material record on request
2. Pre-production Mockup, size sheet, colour reference Mockup and written spec (approval required)
3. In-line print Colour, registration, print defects Photo of approved first piece
4. Assembly Seams, joints, pole fit, base fit Assembly photo set on request
5. Electrical Brightness, driver voltage, wiring, plug type Test photo or video
6. Packing Carton protection, quantity, marks Packing photo
7. Pre-shipment Whole order against specification Photo or video set; third-party inspection welcome

1. Incoming material check

Fabric, aluminium profile, acrylic sheet, LED modules and drivers are checked on arrival for weight, thickness, finish and batch consistency. Material that does not match the approved grade is rejected before it reaches production, not after your order is packed.

2. Pre-production proof

Before a run starts you approve a mockup and written specification covering size, material, printing method, hardware and packing. For colour-critical work a Pantone reference or physical swatch is confirmed, so that red is a number, not an opinion.

3. In-line print check

The first piece off the printer is compared with the approved proof for colour, registration and print defects. The press is adjusted before the run continues, and the approved first piece is kept as the reference for the batch.

4. Assembly check

Seams, pole sleeves, frame joints, magnetic panels and base fittings are checked during assembly. A pole set is test-fitted to its flag, and a frame is assembled before packing, so fit problems are found in the workshop rather than at installation.

5. Electrical test

Every powered unit is switched on and checked for even brightness, correct driver voltage, secure wiring and the plug type for the destination market. Units that fail are reworked or replaced before packing; they are not shipped with a note.

6. Packing check

Cartons are checked for corner protection, foam where required, correct quantity per carton and legible carton marks. A packing photo is taken for each order so the condition at dispatch is documented.

7. Pre-shipment inspection

Before the shipment is booked, the order is checked against the approved specification once more, and you receive a photo or video set of the finished goods. A third-party inspection company can be appointed at your cost and scheduled into the production plan.

Defects and rework

Confirmed defects found before shipment are reworked or remade at our cost. After shipment, claims are handled against the agreed terms in the quotation: photographic evidence, quantity affected and the remedy are confirmed in writing before any credit or replacement is issued. We would rather agree the remedy in writing than leave a buyer guessing.

Documents you receive as evidence

Document When it is provided
Approved mockup and written specification Before production (approval required)
Colour reference or swatch confirmation Before production, on colour-critical jobs
In-line print and assembly photos During production, on request
Electrical test record For every powered unit, on request
Packing photos At dispatch
Pre-shipment photo or video set Before booking the shipment
Third-party inspection support Scheduled into the production plan at your request

Request the QC Checklist Chat on WhatsApp